From LED Modules to Complete Screens
JYLED produces LED modules and assembles complete LED screens in-house, connecting project requirements with production, testing, and delivery.
4-Step Factory Workflow: From Module to Shipment
One connected route for the complete order configuration.
Module Production
Components are processed before module assembly and inspection.
System Assembly
Modules, cabinets, cards, power supplies, and cables are matched to the order.
Screen Testing
The assembled system is checked for image, module, signal, and visible issues.
Aging & Packing
Every order completes 48-hour aging before final inspection and packing.
What We Need Before Production
Confirm the project configuration first.
Regular LED Screens
Normal production timing after configuration confirmation.
Rental LED Screens
Normal timing depends on model, quantity, materials, and schedule.
Inside the JYLED Factory Workflow
Real images from module production, assembly, testing, and handling.
Visit the Factory or Review It by Video
Tell us the product and production stages you want to verify so the relevant line, sample, or screen can be prepared.
Your Question
Which production stages are handled in-house?
JYLED produces LED modules and assembles complete LED screens in-house. The exact route depends on the selected product and project configuration.
What information is needed before production?
Send the screen size, application, pixel pitch, installation method, service access, control requirement, destination, and required delivery date.
How long does production normally take?
Regular LED screens normally require 15–20 days, while rental LED screens normally require about 7 days. Final timing depends on model, quantity, materials, and schedule.
Can we visit the factory or arrange a video review?
Yes. Confirm the product and stages you need to inspect so JYLED can prepare the relevant workshop route, sample, or screen configuration.
Can JYLED provide project drawings?
Engineering drawings can support project-based screen configuration and installation coordination when the required site information is available.
What happens before the order is packed?
The assembled screen proceeds through powered checks, 48-hour aging, final inspection, and project-specific packing.
Continue Your Supplier Review
Related production, quality, testing, and project resources.



.jpg)









