x
Send Your Inquiry Today
x
Get a Quick Quote!

Inside the JYLED LED Display Factory

From LED module production and system assembly to testing, 48-hour aging, final inspection, and packing.

From LED Modules to Complete Screens

JYLED produces LED modules and assembles complete LED screens in-house, connecting project requirements with production, testing, and delivery.

4-Step Factory Workflow: From Module to Shipment

One connected route for the complete order configuration.

01

Module Production

Components are processed before module assembly and inspection.

02

System Assembly

Modules, cabinets, cards, power supplies, and cables are matched to the order.

03

Screen Testing

The assembled system is checked for image, module, signal, and visible issues.

04

Aging & Packing

Every order completes 48-hour aging before final inspection and packing.

What We Need Before Production

Confirm the project configuration first.

Screen sizePixel pitchIndoor or outdoorInstallation methodService accessControl methodDestinationRequired date
15–20 Days

Regular LED Screens

Normal production timing after configuration confirmation.

About 7 Days

Rental LED Screens

Normal timing depends on model, quantity, materials, and schedule.

Inside the JYLED Factory Workflow

Real images from module production, assembly, testing, and handling.

Visit the Factory or Review It by Video

Tell us the product and production stages you want to verify so the relevant line, sample, or screen can be prepared.

Arrange a Factory Review

Your Question

Which production stages are handled in-house?

JYLED produces LED modules and assembles complete LED screens in-house. The exact route depends on the selected product and project configuration.

What information is needed before production?

Send the screen size, application, pixel pitch, installation method, service access, control requirement, destination, and required delivery date.

How long does production normally take?

Regular LED screens normally require 15–20 days, while rental LED screens normally require about 7 days. Final timing depends on model, quantity, materials, and schedule.

Can we visit the factory or arrange a video review?

Yes. Confirm the product and stages you need to inspect so JYLED can prepare the relevant workshop route, sample, or screen configuration.

Can JYLED provide project drawings?

Engineering drawings can support project-based screen configuration and installation coordination when the required site information is available.

What happens before the order is packed?

The assembled screen proceeds through powered checks, 48-hour aging, final inspection, and project-specific packing.

Continue Your Supplier Review

Related production, quality, testing, and project resources.

Get a Quote
Scroll to Top